Complete Streets Concrete Section


Project Objectives

These projects are intended to improve pedestrian accessibility, enhance roadway infrastructure, address deteriorated concrete facilities, and ensure compliance with ADA accessibility standards where applicable. The planned improvements will contribute to safer travel conditions and extend the service life of the City's transportation infrastructure.

 

Future Concrete Improvement Projects

The following concrete infrastructure improvement projects are scheduled for construction:

FY2027
Concrete Section Table
Location Scope of Work
Alameda St. @ Sandoval St. Replace existing sidewalk.
Cerrillos Rd. Airport Rd. Repair damaged curb within the median.
1142 Siler Rd. Replace sidewalk and curb & gutter.
Dancing Ground Rd. Governor Miles Rd. Repair median and ADA-compliant curb ramp.
1027 Camino Carlos Rey Replace sidewalk and curb & gutter.
119 S. Federal Place Repair existing concrete driveway pan.
2001 Agua Fria St. Replace sidewalk and curb & gutter.
Jaguar Drive (near Trailhead) Replace sidewalk and curb & gutter.

* The City of Santa Fe is responsible for maintaining and repairing concrete improvements located on, or contiguous to, City-owned property. All other sidewalks, curbs and gutters, and driveways that front or are contiguous to privately owned property are the responsibility of the adjacent property owner.

Reference: 23-3 SFCC 1987.

*Several factors may affect the completion and scheduling of future projects, including the availability of funding, staffing levels, and equipment resources. Project timelines may also be impacted by inclement weather conditions and the need to address other departmental priorities and responsibilities. These factors can influence workload distribution, resource allocation, and overall project delivery schedules.