Orange Barrel for the Week of November 20, 2023 | City of Santa Fe
 

Orange Barrel for the Week of November 20, 2023

17 Nov, 2023

New Projects

Ashbaugh Park Arroyo (Seeds of Wisdom, LLC) will be conducting urban forestry vegetation management in the arroyo that runs along the west side of Ashbaugh Park from the intersection with Cerrillos Rd. to the intersection of Acequia de los Pinos. To promote proper stormwater flow, saplings, vegetation, and litter will be removed in the arroyo that may impede flow. Seeds of Wisdom will select and remove some trees along the arroyo and prune trees with large broken branches. This work began in November 2023 and may continue into February 2024, depending on weather and other conditions. Contact Andrew Wright at 505-955-2133 or afwright@santafenm.gov should you have any questions.   

Hano and Kiva Road (The City of Santa Fe Public Works Department) Replacing water services from November 20-22. There may be a new service installed on Camino Cerrito. Contact Mark Brooks at mebrooks@santafenm.gov or 505-955-0000 with questions. 

Zafarano Drive (Complete Streets Traffic Operations Team and PPG) Striping will begin Sunday, November 19, at 7 p.m. and will be completed by 2 a.m. This is dependent on temperatures remaining above 35 degrees with no precipitation. Contact Mark Brooks at mebrooks@santafenm.gov or 505-955-0000 with questions. 

 

Ongoing Projects

Alarid St and Camino Sierra Vista (Insituform) will install new liners inside approximately 16,000 feet of sanitary sewer pipe. Insituform will utilize a trenchless technology process where the new liners will be pulled through the existing sewers line by pulling the line through the existing manhole openings, which means no excavation of roads is required. Starting on October 7, 2023, the sanitary sewer line work will start at the intersection of Alarid and Camino Sierra Visita. Once completed, we will move down to the intersection of Mercer St and Onate Rd. Signs will be posted to alert the public of their presence. The project is anticipated to be completed by October 2023. Work will start every evening at 7 p.m. and continue through the night until 7 a.m. Traffic access through the work sites will be delayed, and you should seek alternate routes. Contact Stan Holland, P.E., at 505-955-4637 or Fred Heerbrandt, P.E., at 505-955-4623 with questions.  

Agua Fria/South Meadows (The City of Santa Fe Public Works Department) Public Works Department will begin the work on the Agua Fria/South Meadows Intersection improvements. The project will consist of adding turning bays on Agua Fria and South Meadows and signal improvements. Work started on July 31, 2023, and the project is projected to be completed by February 2024. There will be traffic delays, and you should seek alternate routes when possible. Please contact Mark Brooks at 505-955-2404 or mebrooks@santafenm.gov should you have any questions. 

Cerrillos Road (The City of Santa Fe Public Works Department) replaced a water service at 1932 Cerrillos Road. Work is scheduled to begin Monday, November 13, to Friday, November 17. Contact Randy Lopez at 505-955-4246 or rjlopez@santafenm.gov with questions.  

Cerro Gordo Open Space (The Nature Conservancy) The second phase of an ongoing project, which includes earthwork and fencing, began on November 16, 2022. All work will be performed on Nature Conservancy property, but access is via the City Parks Department’s – Cerro Gordo Open Space trailhead parking area.  The second phase of the project has started and is ongoing. The preserve will remain open. The construction site is temporarily fenced.  Please contact Scott Overlie at saoverlie@santafenm.gov or 505-231-6194 should you have any questions.  

Beckner Rd (Sparling Construction) is finishing the final required landscaping on the road, which has been closed due to the private development of the Vistas de La Sierra subdivision. The road will continue to be closed between Richards Avenue and Wellness Way. Message Boards and detours are in place at the closures until further notice – please seek an alternative route.  

Guadalupe St. (The City of Santa Fe Public Works Department) The work on the Guadalupe St. Reconstruction Project began September 11, 2023. The project is a complete reconstruction of Guadalupe from Alameda to Paseo De Peralta. The project will last for the next 18 months and will include closures, lane shifts, and flagger operations. The first phase will be the reconstruction of the Bridge deck at Guadalupe and Alameda. Guadalupe will be closed in both directions at the bridge, and detours will be in place. There will also be lane shifts on Alameda during this time. Please seek alternate routes and expect delays. Contact Mark Brooks at 505-955-2404 or mebrooks@santafenm.gov should you have any questions.  

Rail Trail – Between 2nd St, St. Michaels Dr and Siringo Rd (Terracon Consultants) Will be doing soil investigations along the Santa Fe Rail Trail between 2nd Street, St. Michaels Dr., and Siringo Rd. The Rail Trail will be closed at 2nd Street, at St. Michaels Dr., and at Siringo Rd. Pedestrian detours will be in place for the Rail Trail on Calle Lorca. Work is scheduled should be completed in November. Please contact Teddy Padilla at 505-231-4794 with questions.  

445 St Michaels Dr (Jaynes Corporation) will be modifying the median, adding a deceleration lane, and adding an underground utility at 445 St Michaels Dr. for St. Vincent’s Hospital. The utility work will start at the neighboring entrance at 435 St. Michaels Dr, and the road will be closed with detours and lane shifts in place until work is completed. Work is scheduled to begin on October 30, 2023, and should be completed on November 30, 2023. Please contact Teddy Padilla at 505-231-4794 with questions.  

Marc Brandt Park at Siringo Rd & Richards Ave (EMCO of Santa Fe) will be clearing sediment and vegetation from the southwest end of Marcel “Marc” Brandt Park to help with the proper flow and drainage of stormwater. The work is scheduled to begin in the first week of November 2023 and should be completed in one week or less once started. The work will involve traffic calming on Richards Ave northbound between the two lanes of Siringo Road. Please contact Andrew Wright at 505-955-2133 or afwright@santafenm.gov should you have any questions. 

Park Avenue (Kelly Cable and New Mexico Gas Company) are working to repair a gas line on Park Avenue. Weather permitting, the asphalt in the roadway will be completed on Friday, November 17, Sidewalks will remain closed until Wednesday, November 22. Please contact Teddy Padilla at 505-231-4794 with questions.  

Tierra Contenta Trail (EMCO of Santa Fe) will be repairing a section of the Tierra Contenta Trail below the Vista del Sol Apartments off Jaguar Dr. The repairs include the installation of a storm drain, trail repaving, and seeding the disturbed area. The work is scheduled to begin in November of November 2023 and should be completed in six to eight weeks once work begins. The work will involve closing a portion of the trail and detouring users to Jaguar Dr. Please contact Andrew Wright at 505-955-2133 or santafenm.gov should you have any questions. 

Santa Fe Train Depot Gas Line Upgrade (410 S Guadalupe St) Public Works facilities will be closing the Garfield St extension that leads to the Vladem, Santa Fe Train Depot, and Tomasitas Restaurant at the end of November or early December. Work should last no longer than a week. Constituents can still access Tomasitas via Manhattan Ave and the Depot/Vladem via pedestrian walkways. Please Contact Josh Bohlman at 505-469-2807 or email jbohlman@santafenm.gov should you have any questions.  

Updated November 17, 2023.

Share