Orange Barrel Report for the Week of December 11, 2023 | City of Santa Fe
 

Orange Barrel Report for the Week of December 11, 2023

8 Dec, 2023

New Projects


115 E. Alameda Street (GM Emulsions) Replacing sidewalks. The road will be closed with detours in place. Work began on December 5. Please contact Teddy Padilla at 505-231-4794 for information.

 

Ongoing Projects


Agua Fria/South Meadows (The City of Santa Fe Public Works Department) The Public Works Department will begin the work on the Agua Fria/South Meadows Intersection improvements. The project will include adding turning bays on Agua Fria and South Meadows and signal improvements. Work started on July 31, 2023, and the project is projected to be completed by February 2024. Traffic delays will occur, and you should seek alternate routes when possible. Please contact Mark Brooks at ebrooks@santafenm.gov or 505-955-2404 with any questions.

Ashbaugh Park Arroyo (Seeds of Wisdom, LLC) will be conducting urban forestry vegetation management in the arroyo that runs along the west side of Ashbaugh Park from the intersection with Cerrillos Rd. to the intersection of Acequia de los Pinos. To promote proper stormwater flow, saplings, vegetation, and litter will be removed in the arroyo that may impede flow. Seeds of Wisdom will select and remove some trees along the arroyo and prune trees with large broken branches. This work began in November 2023 and may continue into February 2024, depending on weather and other conditions. Contact Andrew Wright at afwright@santafenm.gov or 505-955-2133 should you have any questions.

The Cathedral Basilica of St. Francis of Assisi (131 Cathedral Pl.) will be having a road closure for a crane for the installation of a Christmas wreath on the Cathedral on December 12, 2023, and to remove the wreath on January 9, 2024. Detours will be in place. Contact Ryan M. Gomez at rmgomez@santafenm.gov or 505-946-7769 for any questions.

Cerro Gordo Open Space (The Nature Conservancy) The second phase of an ongoing project, which includes earthwork and fencing, began in November 2022. All work will be performed on Nature Conservancy property, but access is via the City Parks Department’s – Cerro Gordo Open Space trailhead parking area. The second phase of the project has started and is ongoing. The preserve will remain open. The construction site is temporarily fenced. Please contact Scott Overlie at saoverlie@santafenm.gov or 505-231-6194 with questions.

Beckner Rd (Sparling Construction) is finishing the final required landscaping on the road, which has been closed due to the private development of the Vistas de La Sierra subdivision. The road will continue to be closed between Richards Avenue and Wellness Way. Message Boards and detours are in place at the closures until further notice – please seek an alternative route.

Guadalupe St. (The City of Santa Fe Public Works Department) The work on the Guadalupe St. Reconstruction Project began September 11, 2023. The project is a complete reconstruction of Guadalupe from Alameda to Paseo De Peralta. The project will last for the next 18 months and will include closures, lane shifts, and flagger operations. The first phase will be the reconstruction of the Bridge deck at Guadalupe and Alameda. Guadalupe will be closed in both directions at the bridge, and detours will be in place. There will also be lane shifts on Alameda during this time. Guadalupe Street will have single-lane closures in place starting Monday, December 11, 2023, in both directions for the removal of medians and temporary asphalt patching. Work is to begin on Guadalupe from West Alameda to West San Francisco Street. Work will include the removal of sidewalks and curb ramps; sidewalks will be closed during the construction process with detours in place for pedestrians. Contact Mark Brooks at mebrooks@santafenm.gov or 505-955-2404 should you have any questions.

445 St Michaels Dr (Jaynes Corporation) will be modifying the median, adding a deceleration lane, and adding an underground utility at 445 St Michaels Dr. for St. Vincent’s Hospital. The utility work will start at the neighboring entrance at 435 St. Michaels Dr, and the road will be closed with detours and lane shifts in place until work is completed. Work began in October. Please contact Teddy Padilla at 505-231-4794 with questions.

Marc Brandt Park at Siringo Rd & Richards Ave (EMCO of Santa Fe) will be clearing sediment and vegetation from the southwest end of Marcel “Marc” Brandt Park to help with the proper flow and drainage of stormwater. The work is scheduled to begin in the first week of November 2023 and should be completed in one week or less once started. The work will involve traffic calming on Richards Ave northbound between the two lanes of Siringo Road. Please contact Andrew Wright at afwright@santafenm.gov or 505-955-2133 should you have any questions.

Tierra Contenta Trail (EMCO of Santa Fe) will be repairing a section of the Tierra Contenta Trail below the Vista del Sol Apartments off Jaguar Dr. The repairs include the installation of a storm drain, trail repaving, and seeding the disturbed area. The work began in November 2023. The work will involve closing a portion of the trail and detouring users to Jaguar Drive. Please contact Andrew Wright at 505-955-2133 with questions.

Santa Fe Train Depot Gas Line Upgrade (410 S Guadalupe St) Public Works facilities will be closing the Garfield St extension that leads to the Vladem, Santa Fe Train Depot, and Tomasitas Restaurant at the end of November or early December. Work should last no longer than a week. Constituents can still access Tomasitas via Manhattan Ave and the Depot/Vladem via pedestrian walkways. Please Contact Josh Bohlman at jbohlman@santafenm.gov or 505-469-2807 with questions.

 

Upcoming


988 Acequia Madre (Ancestral Tree Care) will be having a road closure to do Tree removal on December 9, 2023, from 8 a.m. to 5 p.m. Detours will be in place. Please contact Ryan M. Gomez at rmgomez@santafenm.gov or 505-946-7769 for questions.

Camino Rancheros (PNM) will have a road closure for a crane to change out a pole and transformer. This will be taking place on December 21, 2023, from 7:30 am to 5 pm. Detours will be in place. Please contact Ryan M. Gomez at rmgomez@santafenm.gov or 505-946-7769 for any questions.

San Francisco (Lamoreux Crane Service) will have a road closure for a crane to complete a roofing project. This will be taking place on December 6, 2023, from 6 a.m. to 10 a.m. Detours will be in place. Please contact Ryan M. Gomez at rmgomez@santafenm.gov or 505-946-7769 for any questions.

Old Santa Fe Trail (Titan Electric) will have a road closure to install new electrical services for approximately five days if weather conditions allow the work to proceed. If not longer. No longer than ten days. Work began in December 2023. Detours will be in place. The road will be open every day after 5 pm. Please contact Ryan M. Gomez at rmgomez@santafenm.gov or 505-946-7769 for any questions.

Share