Orange Barrel for the Week of September 10 | City of Santa Fe

Orange Barrel for the Week of September 10

8 Sep, 2023

New


Guadalupe St. (The City of Santa Fe Public Works Department) The work on the Guadalupe St. Reconstruction Project will begin September 11th, 2023. The project is a complete reconstruction of Guadalupe from Alameda to Paseo De Peralta. The project will last for the next 18 months and will include closures, lane shifts, and flagger operations. The first phase, beginning on September 11th, will be the reconstruction of the Bridge deck at Guadalupe and Alameda. Guadalupe will be closed in both directions at the bridge, and detours will be in place. There will also be lane shifts on Alameda during this time. This phase of construction is expected to last for six weeks. Please seek alternate routes and expect delays. Contact Mark Brooks at 505-955-2404 or mebrooks@santafenm.gov should you have any questions.

200 Murales Road (City of Santa Fe Streets Division) is repairing and rebuilding a sidewalk at 200 Murales Road. Work began on Tuesday, September 5th, 2023, and is projected to be completed by September 29th, 2023. Please proceed with caution. Contact Apollo Hernandez at 505-365-8855 should you have any questions.

 

Ongoing


W. Alameda (The City of Santa Fe Public Works Department): The replacement culvert is being designed and constructed to meet the future needs of the improved roadway to be built during the larger West Alameda Capital Improvement Project.

The replacement culvert and channel protection systems are being installed simultaneously. The current rough estimate for the reopening of the road is October 2023. The road closures at Calle Nopal and the Siler Roundabout will remain in place until the repairs are fully completed. Please allow extra travel time if navigating the detours and seek alternate routes whenever possible.

Thank you to all our residents for their patience as we complete this project and make necessary improvements to support the safety of this culvert for years to come!

Cerrillos Rd at the School for the Deaf onto Potencia St and Baca St (Insituform): will install new liners inside approximately 16,000 feet of sanitary sewer pipe. Insituform will utilize a trenchless technology process where the new liners will be pulled through the existing sewers line by pulling the line through the existing manhole openings, which means no excavation of roads is required. The sanitary sewer line rehabilitation work started inside the School for the Deaf property and will continue west into and through the PNM site. From the PNM site, the work will continue west to Potencia St. and Baca St. A by-pass pumping hose will run along the pedestrian and bicycle path. The hose will be present both day and night. Signs will be posted to alert the public of their presence. The project is anticipated to be completed by October 2023. Work will start every evening at 7:00 p.m. and continue through the night until 7:00 a.m. Traffic access through the work sites will be delayed, and you should seek alternate routes. Contact Stan Holland, P.E., at 505-955-4637 or Fred Heerbrandt, P.E., at 505-955-4623 should you have any questions.

Agua Fria/South Meadows (The City of Santa Fe Public Works Department): The Public Works Department will begin the work on the Agua Fria/South Meadows Intersection improvements. The project will consist of adding turning bays on Agua Fria and South Meadows and signal improvements. Work started on July 31, 2023, and the project is projected to be completed by February 2024. There will be traffic delays, and you should seek alternate routes when possible. Please contact Mark Brooks at 505-955-2404 or mebrooks@santafenm.gov should you have any questions.

Ragle Park Ballfield #2 (The City of Santa Fe): The City of Santa Fe will start our re-surfacing project. The Parks Division will work with Hellas Construction, Inc. to install a new synthetic turf field at Ballfield #2. Construction work began on July 31, 2023, and is expected to be completed by October 2023. We will close the park trail on the north side of the ballfield and will have a detour posted on-site. Please contact Scott Overlie at saoverlie@santafenm.gov or 505-231-6194 should you have any questions.

Cerro Gordo Open Space (The Nature Conservancy): the Nature Conservancy’s - Santa Fe Canyon Preserve. The second phase of an ongoing project, which includes earthwork and fencing, began on November 16th, 2022. All work will be performed on Nature Conservancy property, but access is via the City Parks Department’s – Cerro Gordo Open Space trailhead parking area. The second phase of the project has started and is ongoing now through the summer months. The preserve will remain open. The construction site is temporarily fenced. Please contact Scott Overlie at saoverlie@santafenm.gov or 505-231-6194 with any questions.

Beckner Rd (Sparling Construction): The road striping is 90% complete, but road closures are still needed while crews finalize the landscaping. We are projecting this project to be completed by September 2023. The road will continue to be closed between Richards Avenue and Wellness Way. Message Boards and detours are in place at the closures – please seek an alternative route. Please contact Teddy Padilla at 505-231-4794 should you have any questions.

Siringo Road and Saint Michaels Drive (Blue Line Construction): The Rail Trail will be closed on Monday, August 28th, 2023, through September 28th, 2023, between Siringo Road and Saint Michaels Drive as a new sanitary and sewer connection line will be installed along with the rail trail realignment in conjunction for the new Cerro De Norte subdivision. Please contact Blue Line Construction at 505-259-1148 should you have any questions. 

Share