Ongoing
Contractor: EMCO
Location: Arroyo de los Pinos behind Herb Martinez Park
Description: EMCO will install gabion baskets in the arroyo for erosion control. Work began July 15 and is expected to take at least a month. The entry point will be at Santa Clara Drive and Alamosa Drive. Traffic control and signage will be in place with minimal impact on traffic.
Contact: Jimmie Gallegos, jgallegos1@santafenm.gov
Contractor: EMCO
Location: Agua Fria/South Meadows
Project Description: The Public Works Department will begin work on the Agua Fria/South Meadows Intersection improvements. The project will include adding turning bays on Agua Fria and South Meadows and improving the signal. Traffic delays will occur, and you should seek alternate routes when possible. The detour is from South Meadows to Rufina and Jemez Rd. Signage is in place.
Contact: Kody Keelin kwkeelin@santafenm.gov
Contractor: INTERA Incorporated
Location: Camino Porvenir, Fayette St, and between the Acequia Trail and Potencia St
Project Description: On behalf of PNM and under the oversight of NMED PSTB, INTERA is conducting environmental investigation activities along the City of Santa Fe-owned Acequia Trail and in the roadways along Camino Porvenir (near the intersection with Baca St) and along Fayette St. Traffic control and signage will be in place, including necessary detours. Activities include drilling and installing three monitoring wells (one per location). Drilling will begin on August 19, 2024, and continue until mid- to late October 2024. Work will begin at 8:00 a.m. Monday through Friday and will conclude at approximately 5 pm each day.
Contact: Jim Gibb (PSTB Project Manager), jim.gibb@env.nm.gov or E.J. Anderson (PNM Project Manager), ej.anderson@pnmresources.com
Contractor: The Nature Conservancy
Location: Cerro Gordo Open Space
Project Description: The second phase of an ongoing project, which includes earthwork and fencing, began in November 2022. All work will be performed on Nature Conservancy property, but access is via the City Parks Department’s Cerro Gordo Open Space trailhead parking area. The preserve will remain open. The construction site is temporarily fenced.
Contact: Scott Overlie at saoverlie@santafenm.gov or 505-231-6194
Contractor: Coates Tree Service
Location: East Alameda St between Don Gaspar Ave and Old Santa Fe Trail, Northwest corner of Don Gaspar Ave and West DeVargas Street
Project Description: Contractor Coates Tree Service will continue their work on hazard trees at East Alameda and Don Gaspar. This work will be to remove dead limbs of several trees to minimize risk to citizens and as part of maintaining tree health. In addition, we will do similar work to the large willow on the Northwest corner of Don Gaspar Ave and West DeVargas Street. Eastbound and Westbound East Alameda Street will be closed from Don Gaspar Ave to Old Santa Fe Trail starting June 25, 2024, from about 8 am until about 5 pm. Traffic will be detoured around the area. Work will continue on June 26 with a sidewalk closer in the same area on the south side of East Alameda.
Contact: Ryan Pitcher, rspitcher@santafenm.gov, 505-795-4529
Contractor: GM Emulsion
Location: Guadalupe St.
Project Description: The work on the Guadalupe St. Reconstruction Project began on September 11, 2023. The project is a complete reconstruction of Guadalupe from Alameda to Paseo De Peralta. The project will last for the next 18 months and will include closures, lane shifts, and flagger operations. The project is now in phase II, removing the sidewalk, curb, and gutter from West San Francisco St to Paseo De Peralta, along with the median curb replacement at the intersection of Guadalupe & Paseo De Peralta. Work will include removing sidewalks and curb ramps; sidewalks will be closed during construction with pedestrian detours.
Contact: kwkeelin@santafenm.gov
Contractor: GM Emulsion and McDade-Woodcock
Location: Beckner Road and Richards Avenue
Project Description: The City of Santa Fe’s contractors will begin work for a new Traffic Signal and other improvements at the intersection of Richards Ave. and Beckner Rd. the week of July 29. The work is expected to last through the end of August, weather permitting. Message boards and Temporary Traffic Control at the Beckner and Richards Ave intersection will be in place. This is for public Safety. Beckner Rd. shall remain as Right-In and Right-out access only during this work. Left turn movements from Beckner Rd (North) or Mission Bend Rd will not be permitted. (South) until the signals are nearing completion. During the construction, motorists from the Mission Bend Sub-Division, including the school, who wish to take a left turn and head south on Richards Ave., will temporarily use the Mission Bend (North) intersection. Right in/Right out access to Mission Bend (South) will be permitted.
Contact: Ryan M Gomez rmgomez@santafenm.gov
Contractor: GM Emulsion
Location: Rail Trail between Alta Vista St. and I-25
Project Description: Portions of the Rail Trail will be closed July 29-August 26, as GM Emulsion will perform trail maintenance and patchwork. Suitable detours will be provided for closed areas.
Contact: Scott Overlie, saoverlie@santafenm.gov
Contractor: Daniel’s Landscaping and Construction
Location: Santa Fe Place Mall along the trail by the soccer fields.
Project Description: A drainage discharge will be cleared to allow proper water flow to the arroyo. Siberian elms, debris, and trash impeding the drainage system will be removed. Work will begin 8/12/2024 and end 8/16/2024. The working hours will be from 7 a.m. to 4:30 p.m. Signage of work ahead will be in place, and if need be, detours for the trail will be provided.
Contact: Jgallegos1@santafenm.gov
Contractor: Franco’s Trees and Landscaping
Location: West Alameda – Defouri
Project Description: The contractor will trim or remove invasive trees along the SF River Trail. The work will begin on 8/12/2024 and end on 8/16/2024. The sidewalk will be closed and detoured during the 6:30 a.m.- 3:30 p.m. working hours. The attached map shows the detour.
Contact: Jimmie Gallegos, jgallegos1@santafenm.gov