Project Manager
P. Fred Heerbrandt
pfheerbrandt@santafenm.gov
Proposal Submission Information
City of Santa Fe Purchasing Office purchasing_RFP@santafenm.govDescription
The overall purpose is to develop a Master Plan that will provide a road map for the facility for future improvements to ensure current and future water quality standards are met, and that the treatment capacity is developed in conjunction with future population growth. This Master Plan must be developed in a manner for it to be reliable, flexible, and adaptable to meet expected as well as new challenges over the next 25 years. A 25 year horizon is the basis of the Master Plan; however ninety-five percent of the effort shall be targeted on the 1 to 10 year horizon. The reason for placing a smaller effort at the 10 to 25 years is the volatility of environmental standards and technological advancements, which make it difficult to plan with any type of certainty too far in the future. However, it is important to look at the 25 year horizon to assess population growth and possibly forecasting the need for another facility. The Master Plan is intended to be a dynamic document that should be updated every five years. The Master Plan is for the entire facility located at 73 Paseo Real which includes all building and equipment located at this campus
Amendment 1 133KB